our products

D&Q Mining is a high-tech company integrating R&D, production and sales. It provides mature products and solutions such as crushers, sand making, milling equipment, mobile crushing stations, etc., for aggregate, mining and waste recycling.

dewatering process in cbm reservoir

Dewatering Process In Cbm Reservoir

Dewatering Process In Cbm Reservoir. 7.2.2 CBM Well However, CBM reservoir behaves differently from the conventional oil and gas reservoir. In CBM res ervoir, dewatering is essential to facilitate gas production. It is very important that the dewatering is done with immense precaution so that the fragile coal seams will not be damaged and the gas will be produced efficiently.

More

Dewatering rate optimization for coal-bed methane well

Jan 15, 2017· In coal-bed methane (CBM) reservoirs, gas is mainly stored in matrix as adsorbed gas and the cleats are commonly saturated with water. To produce the adsorbed gas, the cleat pressure should be reduced to critical desorption pressure by dewatering first. But how to dewater more efficiently is a difficult issue.

More

Smart de-watering and production system through real-time

Apr 01, 2016· During dewatering process, water is pumped out of the coal bed and reservoir pressure is lowered so that gas is desorbed from coal surface. If the measured gas content is higher than the theoretical maximum absorption gas content, it is a saturated CBM reservoir and contains both adsorption and free gas; otherwise, it is an undersaturated CBM reservoir and contains adsorption

More

Development of material balance equations for coalbed

Jul 01, 2018· Saturated CBM reservoirs do not have single water phase dewatering stage, while for undersaturated CBM reservoir, theoretically, when the pressure is above critical desorption pressure, single water phase dewatering stage maintains for a certain period of time after the well is opened.

More

dewatering process in cbm 」

Dewatering of Coalbed Methane Wells with Hydraulic Gas . Proper dewatering of coalbed methane CBM wells is the key to efficient gas production from these reservoirs. This paper presents the Hydraulic Gas Pump as a new alternative dewatering system for CBM wells. The Hydraulic Gas Pump HGP concept offers several operational advantages for CBM wells.

More

(PDF) Methods for simultaneously evaluating reserve and

saturated CBM reservoir at the early dewatering stage are. established. 2.1 Assumptions. The MBE, water productivity equation, and FMBE of an . undersaturated CBM reservoir are developed on the

More

Methods for simultaneously evaluating reserve and

On the basis of water productivity equation of a CBM well and the MBE for undersaturated CBM reservoirs at the dewatering stage, the FMBE is established for undersaturated CBM reservoirs, which considers immobile free gas expansion effect; then five straight-line methods are proposed to determine the control area, initial water reserve, initial free gas reserve, initial adsorbed gas reserve, OGIP, and permeability at the same time.

More

A novel method for formation evaluation of undersaturated

Development of material balance equations for coalbed methane reservoirs considering dewatering process, gas solubility, pore compressibility and matrix shrinkage The CBM reservoir is treated

More

Type Curves for Dry CBM Reservoirs with Equilibrium Desorption

Gas production from the CBM reservoirs is controlled by a four-step process that includes: (i) dewatering process, (ii) desorption of gas from coal surface, (iii) diffusion of gas to the fracture system, (iv) flow of the gas through the fractures to the wellbore.(6) Two categories of

More

Dewatering Techniques for Construction Projects

Dec 06, 2019· Normally the dewatering process is done by pumping or evaporation. It is usually done before excavation for footings and will help to lower the water table that

More

(PDF) Methods for simultaneously evaluating reserve and

saturated CBM reservoir at the early dewatering stage are. established. 2.1 Assumptions. The MBE, water productivity equation, and FMBE of an . undersaturated CBM reservoir are developed on the

More

Methods for simultaneously evaluating reserve and

Jan 09, 2020· In this work, a flowing material balance equation (FMBE) is established for undersaturated coalbed methane (CBM) reservoirs, which considers immobile free gas expansion effect at the dewatering stage. Based on the established FMBE, five straight-line methods are proposed to determine the control area, initial water reserve, initial free gas reserve, initial adsorbed gas reserve, original gas

More

A novel method for formation evaluation of undersaturated

Development of material balance equations for coalbed methane reservoirs considering dewatering process, gas solubility, pore compressibility and matrix shrinkage The CBM reservoir is treated

More

(PDF) New Technique to Accelerate Gas Production on CBM

Coal Bed Methane (CBM) is an unconventional resource that shows great promise, particularly in Indonesia, whose CBM reservoir is relatively thick. Gas reserves of CBM

More

Type Curves for Dry CBM Reservoirs with Equilibrium Desorption

Gas production from the CBM reservoirs is controlled by a four-step process that includes: (i) dewatering process, (ii) desorption of gas from coal surface, (iii) diffusion of gas to the fracture system, (iv) flow of the gas through the fractures to the wellbore.(6) Two categories of

More

of Steeply-Dipping Ultra-Thick Coalbed Methane Reservoirs

3 Key Laboratory of CBM Resources and Reservoir Formation Process, Ministry of Education, China University of Mining and Technology, Xuzhou 221008, China; [email protected] the dewatering of the coal seams for the purpose of reducing the reservoir pressure and liquid saturation [25]. Therefore, for many CBM reservoirs, the

More

study of CBM (Coalbed Methane) production process

Nov 11, 2014· During this phase CBM wells experiment a constant water production with a very low or negligible gas production Initially, most CBM wells are naturally water saturated because water liberation occurs during the coalification process The water is occupying the principal cleat network and there is the need of removing the water from the major

More

Best Practices for Dewatering at a Construction Site MWI

Mar 09, 2016· The type of dewatering system you use depends on the situation you uncover on the construction site. An engineering study will uncover it beforehand. Or, you’ll make a dewatering system selection based on what you discover as you begin excavation. In all situations, there are general guidelines to follow for safety and for effectiveness.

More

The Four Major Dewatering Methods and How to Choose One

Apr 12, 2016· The eductor well method is a dewatering process used to control pore water pressures in materials with low permeability characteristics, such as fissured clays or silts. This method uses the venturi principle, where high pressure water is circulated through eductors in the base of each well to create a vacuum that helps promote drainage.

More

Dewatering Techniques for Construction Projects

Dec 06, 2019· Dewatering can also refer to the process of removing water from the soil by wet classification. Wet classification is a construction process that looks at the size of particles that make up the underlying soil in a project site and the flow of fluids through those particles.

More

Exploration and production method of Coal Bed Methane.

Oct 25, 2016· CBM PRODUCTION PHASES Coal bed methane production passes through three phases during the life time of the reservoir- • Dewatering phase • Stable production phase • Declining phase 9. DEWATERING PHASE • During the phase CBM wells experiment a constant water production with a very low or negligible gas production.

More

Well-Testing CBM-Wells Definition of Major Anomalies with

Abstract—Coal Bed methane reservoir is a naturally fractured reservoir in which coal serves as both the source and This is as a result of pressure lowering process resulting from dewatering of the coal. Summarily, the CBM production process has many similarities to

More

New Technique to Accelerate Gas Production on CBM

CBM is produced by firstly engineering coal as a reservoir to obtain enough space as a methane gas exit. The engineering process begins with producing water (dewatering) in

More